Hi,
is it possible to avoid the merging of two parallel edges, which are valid at different time intervals? Within the Data Table this seems to be possible by introducing a new column and giving different values to the two edges in this column. However, if I import edge data from a csv-file, all parallel edges are automatically merged, regardless of different intervals or other values.
Does anybody have a suggestion on how to approach this problem?
Thanks a lot.
Melanie
Avoid merging edges with different intervals
-
- Posts:1
- Joined:06 Apr 2017 09:32 [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable
- eduramiba
- Gephi Code Manager
- Posts:1064
- Joined:22 Mar 2010 15:30
- Location:Madrid, Spain [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable
Re: Avoid merging edges with different intervals
Hi,
This will be possible with next version of Gephi, where spreadsheet import has been improved.
This will be possible with next version of Gephi, where spreadsheet import has been improved.
-
- Posts:1
- Joined:12 Apr 2017 03:56 [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable
Re: Avoid merging edges with different intervals
Do you have a schedule and/or change list for the next release?
Thanks
Thanks
- eduramiba
- Gephi Code Manager
- Posts:1064
- Joined:22 Mar 2010 15:30
- Location:Madrid, Spain [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable
Re: Avoid merging edges with different intervals
Hi,
It will probably be out this summer, but there is no schedule.
The expected change list is here https://github.com/gephi/gephi/milestone/23
It will probably be out this summer, but there is no schedule.
The expected change list is here https://github.com/gephi/gephi/milestone/23