Hi!
I am new to this forum so if my topic is posted at the wrong location or anything I apologize.
Trying to visualize the expansion of a network I am using the dynamic timeline in Gephi. As of now it works, but when I create the intervals in the data laboratory the start time column and end time column become a large numbers instead of the date values I merged them from. This takes away a lot of information about the network.
I would like it to be similar to this https://www.youtube.com/watch?v=hKYku8b60Dc , and as my dates are formated as yyyy-mm-dd I can't really see why it would change it.
Does anyone know how to solve this?
Regards!
Dynamic timeline with dates
-
- Posts:13
- Joined:23 Nov 2016 14:16 [phpBB Debug] PHP Warning: in file [ROOT]/vendor/twig/twig/lib/Twig/Extension/Core.php on line 1275: count(): Parameter must be an array or an object that implements Countable
Re: Dynamic timeline with dates
Figured it out.
In the bottom left corner of the timeline is a small gear icon with a "Set time format" option. By choosing "Date" on the radiobutton it changed to a timeline similar to that in the youtube link.
In the bottom left corner of the timeline is a small gear icon with a "Set time format" option. By choosing "Date" on the radiobutton it changed to a timeline similar to that in the youtube link.